Passer au contenu principal
232 kb

GUYOT ENVIRONNEMENT

Solid Recovered Fuel (SRF) & Refuse-Derived Fuel (RDF) production unit

Découvrir article de Recyclage Récupération

Features of the installation

  • Modernization of the existing site, originally designed by Aktid in 2014.

    • 4 months of continuous production maintained during the 6-month construction period.

    • 30% of existing equipment reused.

  • Ultra-efficient dust extraction system with more than 40 capture points.

  • Agile process with two different feeding lines depending on the incoming waste stream type, capable of sorting and recovering a wide range of materials.

  • Maximum material recovery before energy recovery.

  • Customized production of various SRF/RDF qualities:
    Customizable formulas (composition, particle size, moisture rate, etc.) via ABI.

  • Minimum recovery rate: 95%

115 kb
Centre de tri CSR _ Guyot environnement
Picto emplacement

Location:

Morlaix (29), France

Picto client

Customer:

GUYOT ENVIRONNEMENT

Picto débit horaire

Hourly throughput:

20 t/h main line
4 t/h secondary line

Picto Gisement entrant

Incoming waste:

Commercial & Industrial waste (C&I)
Bulky waste
Automotive Shredder Residue (ASR)

Picto Capacité annuelle

Annual capacity:

65,000 t/year
SRF/RDF production: 42,000 t/year

This reference includes Aktid Smart Solutions:

ABI 

1st MES-type management system specially designed and developed by and for operators of waste sorting centres to improve and control the performance of their facilities.

En savoir +