Blog
22/01/2026
Blog
Aktid Decrypts – When christmas magic gets tangled
The end-of-year holidays are over ! As every year, sorting centers see a flow of unusual waste - including Christmas trees and their nets. These seasonal contaminants, well known to operators, are…
01/10/2025
Blog
Inauguration of the SIAVED sorting center: a next-generation sorting facility designed by Aktid
The SIAVED sorting center has been designed to process up to 36,500 tonnes of waste per year. This capacity ensures long-term security […]
08/08/2025
Blog
New Chambéry sorting center: a flagship site and a laboratory for next-generation sorting
The new Chambéry sorting center optimizes the recovery of packaging waste from 17 local authorities, representing a population catchment area of approximately 850,000 inhabitants. Designed to process […]
07/07/2025
Blog
Inauguration of VALCOPIA in Toulouse: the largest selective collection sorting center in France
In July 2025, the VALCOPIA sorting center, located near Toulouse, was officially inaugurated. Designed and built by Aktid for the Decoset intermunicipal authority, this new facility is now the largest…
17/06/2025
Blog
Aktid has been awarded the project to modernize the European Metropolis of Lille (MEL) sorting center, located in Halluin in northern France.
It will be operated by Triselec, the local public company responsible for managing the MEL sorting centers. This strategic project aims to transform the […]
05/05/2025
Blog
Inauguration of Trivalandes’ SRF production unit
In May 2025, the departmental authority Trivalis inaugurated the Trivalandes Solid Recovered Fuel (SRF) production unit, located in Saint-Christophe-du-Ligneron, in […]
16/04/2025
Blog
Safety at the heart of sorting centers: Aktid’s commitment
Safety in waste sorting centers is a major concern for professionals in the sector. Aware of the sometimes challenging working conditions [...]
19/03/2025
Blog
Lely Environnement selects Aktid for its new sorting facility
Lely Environnement, a recognized player in waste management in the Rhône-Alpes region, has entrusted Aktid with the design and construction of its new sorting facility at its Saint-Quentin-sur-Isère site (38).
15/01/2025
Blog
Aktid 2024 Report
The year 2024 marks a key milestone for Aktid, with major technological advances, large-scale projects, and international expansion […]