Passer au contenu principal
227 kb

TI VALO 22

Solid Recovered Fuel (SRF) and Refuse-Derived Fuel (RDF) production unit from Municipal Solid Waste (MSW)

Features of the installation:

  • Maximum material recovery, with an 80% reduction in the tonnage sent to landfill or incineration.
  • SRF/RDF production from Municipal Solid Waste (MSW) — refusals from Mechanical Biological Treatment (MBT).
  • Material and energy recovery from a highly heterogeneous incoming stream: minimum 31% energy recovery and 37% material recovery.
  • Pre-sorting of C&I waste streams.
  • SRF/RDF production: 20,000 to 25,000 tonnes per year of high-quality fuel (18,000 kJ/kg) destined for cement plants or local heating systems, with continuous quality control (LHV, moisture content, chlorine rate).
74 kb
Kerval Centre Armor
Picto emplacement

Location:

Saint Brieuc, France

Picto client

Customer:

Kerval Centre Armor (MGP with Guyot Environnement)

Picto débit horaire

Hourly throughput:

20 T/hour

Picto Gisement entrant

Incoming waste:

Commercial & Industrial (C&I) waste, bulky waste, MBT refusals, and refusals from packaging materials – Materials Recovery Facilities (MRFs)

Picto Capacité annuelle

Annual capacity:

65 000 T/year