CENTRO DI SELEZIONE DI MORLAIX

Revamping objectives :

  • Increase in Annual Capacity: Expansion of the annual production capacity.
  • Reintegration of Non-Aktid Equipment: Reintegrating equipment not originally from Aktid.
  • Integration of Dust Extraction: Implementation of dust extraction systems on both the existing line and the Aktid line.
  • Reduction of Landfill Contribution: Optimization of energy and material recovery to reduce the share of landfill waste.

Project features :

  • Parallel Site Operation: The site will be operated in parallel with ongoing activities.
  • Minimization of Line Downtime: Efforts will be made to minimize interruptions in the operation of the production line.
  • Replacement and Addition of Equipment: Replacement and addition of equipment, with preservation or reuse of many conveyors and existing materials.
Picto emplacement

Location :

Morlaix (22)

Picto client

Customer :

GUYOT ENVIRONNEMENT

Picto débit horaire

Hourly Throughput :

20 T/h

Picto Gisement entrant

Incoming waste :

CIW, bulky items

Picto Capacité annuelle

Anual Capacity :

60, 000 tonnes

Picto date

Delivery date :

2023